Search
+
    SEARCHED FOR:

    DRIVERLESS TRAINS

    Delhi metro goes driverless; Will India get on board?

    Delhi Metro set a new record with 1.6 million passengers using driverless trains on November 2. This figure represents a significant portion of the network's eight million daily ridership. The introduction of driverless trains has sparked discussions about their potential in other metro systems. Transportation officials argue that automation improves operational efficiency but raises some concerns about costs.

    Bengaluru's Blue Line promises cheaper airport rides, but Tamil Nadu's stone transport ban poses a hurdle; check latest update

    Bengaluru blue line news: Restrictions imposed by Tamil Nadu on stone transportation have significantly affected construction projects in Bengaluru. Contractors executing the Namma Metro Blue Line are experiencing material shortages, which are delaying works. The ban has also led to substantial price increases for construction materials due to limited supply options. As a result, many truck operators and suppliers are facing difficulties in their operations.

    Bengaluru’s Rs 1,500 airport cab rides could soon get cheaper because of the Blue Line: Check operation timeline, route and other key details

    Bengaluru Blue line: Bengaluru's Blue Line Metro is set to connect Central Silk Board with Kempegowda International Airport. The airport stretch is targeted for completion by September 2027, with further sections to follow. This project aims to reduce reliance on taxis and private vehicles for airport transportation. The new metro line will incorporate driverless technology to enhance efficiency and safety.

    PM Modi inaugurates Rs 4,900 crore 15-km Chennai Metro Phase II stretch, rides along with CM Vijay

    Prime Minister Narendra Modi inaugurated the 15-km Poonamallee-Vadapalani stretch of the Chennai Metro Rail Project. This new stretch, built at a cost of around Rs 4,900 crore, features advanced signalling systems. It is expected to improve connectivity between Chennai's western suburbs and the city centre. The Chennai Metro stretch is part of a wider development programme worth over Rs 13,000 crore that Modi is scheduled to launch across Tamil Nadu.

    Chennai Metro route & timings: New Poonamallee–Vadapalani stretch opens with 11 stations; when can passengers board trains?

    Chennai Metro timings: Prime Minister Narendra Modi inaugurated the 15-km Poonamallee-Vadapalani stretch of Chennai Metro Phase II on Sunday, alongside Tamil Nadu Chief Minister C Joseph Vijay. Built at a cost of around Rs 4,900 crore, the route has 11 elevated stations and a 3.7-km double-decker structure. Passenger services began on October 11, with regular operations scheduled from 7 am to 9 pm from October 12.

    Warren Buffett calls out the worst accounting trick in corporate America, and the analysts who help it along

    Every loan that Warren Buffett’s home business makes, it keeps. When the borrower stops paying, the loss is borne by his company rather than somebody who bought the paper years ago. Buffett contrasts that with how the last housing crisis was built, and then applies the same test to accounting, to executive pay, and to the numbers analysts repeat without checking. One question runs through all of it, and almost no annual report answers it.

    The Economic Times
    BACK TO TOP