Search
+
    SEARCHED FOR:

    KAMRUP METRO TRAIN ACCIDENT

    Kolkata-Sairang Express derailment in Assam: Six coaches go off tracks at Digaru station, several passengers injured

    Six coaches of the Kolkata-Sairang Express derailed at Digaru railway station in Assam's Kamrup (Metro) district around 6.54 am on Wednesday. Several passengers were reportedly injured, while Northeast Frontier Railway said no casualties had been reported so far. Senior railway officials rushed to the spot following the incident. The cause of the derailment is yet to be established.

    Assam plans major project to reclaim land lost to Brahmaputra's changing course

    Assam Chief Minister Himanta Biswa Sarma visited Kayantol in Hajo, Kamrup district, and Sonka in Mayong, Morigaon district to assess the feasibility of the proposed project on the ground.

    Mumbai’s first non-ac local train set to have automatic sliding doors, improved legroom, CCTV cameras, fire detection systems and emergency communication facilities; check details

    Mumbai latest news: Mumbai's suburban railway prepares to introduce a new non-AC local train with automatic doors for passenger safety. This development follows the June 2025 Mumbra accident, which underscored risks linked to overcrowding. The new train features louvred panels for ventilation while eliminating open doorways during travel. Trials will determine the effectiveness of the automatic doors and their impact on service schedules.

    European tech is coming to Bengaluru's suburban tracks: Rs 1,017 crore ETCS upgrade planned across two corridors

    Bengaluru's suburban rail project will adopt the European Train Control System (ETCS) Level-2 for corridors 2 and 4, with the signalling infrastructure estimated to cost Rs 1,017 crore, excluding GST and customs duty. K-Ride has floated a tender for the system, replacing the earlier CBTC proposal. The Mallige and Kanaka lines are expected to have different installation timelines, while ICF will manufacture 51 three-coach trains for the project.

    Egypt train collision: 7 dead, 112 injured as two passenger trains collide near Cairo
    L&T to build 10 stations for Noida Metro Aqua Line under Rs 1,000 to 2,500 crore order

    Larsen & Toubro has announced the receipt of a significant design and construction order from Noida Metro. This order involves the extension of the Aqua Line with a 15.1 km elevated viaduct construction project. It will include ten elevated metro stations that require architectural finishes for completion. The project is required to be completed within a strict timeline of 36 months.

    The Economic Times
    BACK TO TOP