Search
+
    SEARCHED FOR:

    CHHATTISGARH RAILWAY CONNECTIVITY

    After 79 years, Railways reaches this remote town for the first time since Independence; Rs 1,628 crore line opens, two new trains flagged off

    Indian Railways has connected Chhattisgarh’s Rowghat to the national rail network for the first time since Independence, with the inauguration of the Tadoki-Rowghat railway line. The 17.5-km stretch completes the 95-km Dalli-Rajhara-Rowghat project. Two new passenger services, Rowghat-Raipur and Raipur-Kurud, were also flagged off, improving regional connectivity and access to industrial and economic opportunities.

    Indian Railways links Chhattisgarh’s Rowghat to national network for first time since independence
    Indian Railways maintains consistent punctuality despite heavy passenger demand

    The railways said that it has improved from 69.2% in 2018-19 to 77.43 in 2025-26 & 77.11% in 2026-27 (till now) if punctuality data are taken into consideration. It said that consistent performance on more than 77 per cent punctuality in the last three years, including the current year, is an improved performance from the year 2023-24, when it was 73.62 per cent.

    Chhattisgarh floods: Check roads, rail routes and trains hit by heavy rain

    Chhattisgarh is facing widespread disruption after heavy rainfall caused the Kharun River to rise and flooded roads and villages in parts of Raipur and Durg. Rail services were also affected after waterlogging and track subsidence on the Durg-Dallirajhara section. Several trains were cancelled or curtailed, while heavy rain has also inundated low-lying areas and disrupted connectivity elsewhere in the state.

    Indian Railways approves construction of a four-lane road overbridge on the Udhna-Ukai Songadh section of Western Railway

    The Indian Railways has greenlit the construction of a four-lane Road Over Bridge, with a budget exceeding 133 crore rupees. This initiative aims to streamline both road and rail traffic, enhancing overall accessibility. In addition, three multitracking projects, worth 10,783 crore rupees collectively, have been sanctioned to boost freight capacity and connectivity across five states, marking a significant investment in transport infrastructure.

    Train passengers could be the biggest beneficiaries: India completes 2,843-km Dedicated Freight Corridor; how shifting goods trains to separate tracks could change rail travel

    India’s Dedicated Freight Corridor network, spanning 2,843 km, is now fully operational, marking a significant milestone in the country’s infrastructure development. The network is designed to ease congestion on existing railway lines, enabling freight trains to operate with greater speed and reliability. The DFC is expected to improve India’s logistics efficiency, strengthen competitiveness and encourage a shift in freight transportation from roads to railways.

    The Economic Times
    BACK TO TOP